Sinking Fund Projects

2017-2018 Projects

District
Security Upgrade- The Lockout Boot Company
Betsie Valley
Replace Gate
Unit Ventilator Controls
Drinking Fountain
Crystal Lake
New Kitchen Flooring
Fire Suppression System in Kitchen
Kitchen Hood
Kitchen Exhaust
Ventilation System
New Kitchen Plumbing, Cement Pad
New Faucets and Valves
Waterheater
Replaced Boiler Components
High School
New Hallways
Roof Top Heating/Air Conditioning Unit
Removal of track surface
New Fence and Gates Football Field

2018-2019 Projects

District
124 Chromebooks
124 Chromebook Licenses
2 Chromebook Carts

Betsie Valley
Playground Equipment
Boiler Controls, Wiring, and Venting
Replacement of Lights
Water Filters
Water Cooler Bottle Fill
Door Replacement
Dome Cameras
DVR for Security Cameras

Crystal Lake
Building Repairs
Playground Door Lock
Playground Equipment
Water Cooler Bottle Fill Station

High School
Hallway Flooring West Wing
Drinking Faucets
Gym Floor
16 Channel DVR for Camera System
Press Box Remodel
Fire Suppression System
Fire Alarm
Maintenance Shop Door
Bleacher Repairs
Door and Door Jamb Replacement welding Shop
Fence Repairs and new Gate
Replacement of Gate Valves
Disposal Field Replacement

Lake Ann
Gym Floor
Air Handler Repairs
Playground Equipment
Water Cooler Bottle Fill Station

Middle School
Gym Floor
Building Repairs
Egress Fire Doors
Door Locks
Water Cooler Bottle Fill Station

2019-2020 Projects

District
Chromebooks
Charging Cart
Signage for Boot System
New Sign
Chromebook Cases
Hard Drives
Insulation

Betsie Valley
New Hallway Flooring
New Gym/Cafeteria Flooring
New Classroom Flooring
New Carpeting 2 rooms
Flooring/Ceiling Project
Replace Window Screens
Door and Door Jamb Replacement Boiler Room
Inside Doors Lock Cylinder Replacement
Steam Coil Replacement
Washer and Dryer Hookup

Benzie Academy
New Flooring
Signage
Crystal Lake
Projector
Playground Equipment
Replace Sewer Line
2 security cameras
Washer and Dryer Hookup

High School
Gym Floor
Refinish Stage Flooring
Resurface Baseball and Softball Field
Garage Door for Green House
Plumbing Updates
Electrical Upgrades to Woodshop
Science Lab Duct Install
Replace Steam Coil
Football Field
Boiler Feed Tank Replacement
New Sidewalks and Spillways North side
Fire Door Replacement
Replace Damaged Fascia
Installed Cell Foam Insulation Auditorium

Lake Ann
New Classroom Flooring
Playground Equipment
Fencing/Gates
Curb and Sidewalk Replacement
Door and Door Jamb Replacement Boiler Room

Middle School
Gym Floor